Illinois State Library

Electronic Documents of Illinois


Search:
T* in FirstWord [X]
Illinois Environmental Protection Agency, Bureau of Water in Organization [X]
rss icon RSS
Results:  61 Items
Sorted by:  
Page: Prev  1 2 3 4  Next
SiteTitle
TMDL Development for Bonpas Creek Watershed (1)
TMDL Development for Evergreen Lake: Quarterly Report (1)
TMDL Development for Evergreen Lake: Quarterly Report #1 (1)
TMDL Development for Galena/Sinsinawa Rivers Watershed (1)
TMDL Development for Homer Lake in the Salt Fork Vermilion River Watershed, Illinois: Stage Three Report: TMDL Development (1)
TMDL Development for Horseshoe Lake Watershed (1)
TMDL Development for Lake Canton Watershed (1)
TMDL Development for Lake Michigan Beaches (1)
TMDL Development for Lake Springfield Watershed (1)
TMDL Development for Ohio River Watershed (1)
TMDL Development for Pecatonica River Watershed (1)
TMDL Development for Prairie Creek/Langan Creek Watershed (1)
TMDL Development for Rend Lake Watershed (1)
TMDL Development for Upper Big Muddy River Watershed (1)
TMDL Development for Vermont City Reservoir/Sugar Creek Watershed (1)
TMDL Development for the Cedar Creek/Cedar Lake Watershed, Illinois: Draft Report for IEPA Review (1)
TMDL Development for the Crab Orchard Creek Watershed, Illinois: Stage Three Report Public Review Draft (1)
TMDL Development for the Crooked Creek Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Final Report: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Lake Oakland and Walnut Point Lake Watersheds: Public Review Draft Report: Stage Three Report: Lake Oakland TMDL Development (1)
TMDL Development for the Little Vermilion River Watershed: Final Report (2)
TMDL Development for the Little Wabash River Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the Little Wabash River Watershed, Illinois: Public Review Draft (1)
TMDL Development for the Mt. Olive New Lake, Mt. Olive Old Lake, and Staunton Lake Watersheds: Stage One Report: Watershed Characterization and Water Quality Analysis (2)
TMDL Development for the Salt Fork Vermilion River Watershed: Stage One Report: Watershed Characterization and Water Quality Analysis (1)
TMDL Development for the Shoal Creek Watershed, Illinois: Draft Report for Public Review (1)
TMDL Development for the South Fork Saline River/Lake of Egypt Watershed, Illinois: Public Review Draft Report (1)
TMDL Scoping Report Development for Lake Michigan (nearshore) Mercury and Polychlorinated Biphenyls (1)
TMDL and LRS Development for Middle Illinois River Watershed (1)
Tampier Lake/Saganashkee Slough Watersheds Stage One TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds Stage Three TMDL Draft Report (1)
Tampier Lake/Saganashkee Slough Watersheds TMDL Report (1)
Thorn Creek Watershed Based Plan (1)
Thorn Creek Watershed TMDL Stage 1 Report (1)
Total Maximum Daily Load Development for Altamont New Reservoir Watershed (1)
Total Maximum Daily Load Development for Beaucoup Creek Watershed (1)
Total Maximum Daily Load Development for Big Muddy River #1 Watershed (1)
Total Maximum Daily Load Development for Bonnie Creek Watershed (1)
Total Maximum Daily Load Development for Casey Fork Watershed (1)
Total Maximum Daily Load Development for Dutchman Creek Watershed (1)
Total Maximum Daily Load Development for Fox River (2)
Total Maximum Daily Load Development for Little Muddy River Watershed: Draft Final Report (1)
Total Maximum Daily Load Development for Vandalia Lake Watershed: Draft Final Report (1)
Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report (2)
Total Maximum Daily Load Evergreen Lake Watershed: Stage Three Draft Report (1)
Total Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final (1)
Total Maximum Daily Load, Shoreline Segments in Chicago, Cook County, Illinois: 29 Segments from Juneway Terrace Park Beach to Calumet South Beach (1)
Total Maximum Daily Load, Shoreline Segments in Lake County, Illinois: 9 Segments from North Point Marina Beach to Highland Park Rosewood Beach (1)
Total Maximum Daily Loads for Salt Creek, Illinois: Final Report (1)
Total Maximum Daily Loads for West Branch DuPage River, Illinois (2)
Total Maximum Daily Loads for the East Branch of the DuPage River, Illinois (1)
Total maximum daily load, shoreline segments in Suburban Cook County, Illinois: 13 Segments from Glencoe Park Beach to Evanston South Beach (1)
Triennial Capacity Development Report (1)
Triennial Capacity Development Report, 2011 (1)
Triennial Capacity Development Report: Safe Drinking Water: Leveraging Resources and Planning for the Future, 2008 (1)
Organization
Illinois Environmental Protection Agency, Bureau of Water[X]
XMLRecordID
000000040719 (1)
000000040722 (1)
000000040723 (1)
000000040725 (1)
000000040726 (1)
DateCreated
 

Title:  

Total Maximum Daily Load Development for Bonnie Creek Watershed

 
 Volume/Number:  2004 January 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  01 14 2004 
 Agency ID:   
 ISL ID:  000000042968   Original UID: 22498 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Development for Casey Fork Watershed

 
 Volume/Number:  2003 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  10 28 2003 
 Agency ID:   
 ISL ID:  000000042972   Original UID: 22502 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Development for Dutchman Creek Watershed

 
 Volume/Number:  2003 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  10 29 2003 
 Agency ID:   
 ISL ID:  000000043182   Original UID: 22696 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Development for Fox River

 
 Volume/Number:  2004 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 13 2004 
 Agency ID:   
 ISL ID:  000000040725   Original UID: 20899 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Development for Fox River

 
 Volume/Number:  2004 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 13 2004 
 Agency ID:   
 ISL ID:  000000040726   Original UID: 20899 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Development for Little Muddy River Watershed: Draft Final Report

 
 Volume/Number:  2004 January 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  01 16 2004 
 Agency ID:   
 ISL ID:  000000043205   Original UID: 22723 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Development for Vandalia Lake Watershed: Draft Final Report

 
 Volume/Number:  2003 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  10 28 2003 
 Agency ID:   
 ISL ID:  000000043285   Original UID: 22792 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report

 
 Volume/Number:  2005 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043183   Original UID: 22697 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage One Final Report

 
 Volume/Number:  2005 April 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  04 28 2005 
 Agency ID:   
 ISL ID:  000000043184   Original UID: 22697 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Evergreen Lake Watershed: Stage Three Draft Report

 
 Volume/Number:  2005 July 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 3 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  07 21 2005 
 Agency ID:   
 ISL ID:  000000043388   Original UID: 22879 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load Report for the Kankakee/Iroquois Watershed, Final

 
 Volume/Number:  2009 October 23 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  11 24 2009 
 Agency ID:   
 ISL ID:  000000040731   Original UID: 20904 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load, Shoreline Segments in Chicago, Cook County, Illinois: 29 Segments from Juneway Terrace Park Beach to Calumet South Beach

 
 Volume/Number:  2013  
 Issuing Agency:   
 Description:  This report documents the analysis and findings of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  05-13-2013 
 Agency ID:   
 ISL ID:  000000055937   Original UID: 176891 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Load, Shoreline Segments in Lake County, Illinois: 9 Segments from North Point Marina Beach to Highland Park Rosewood Beach

 
 Volume/Number:  2013  
 Issuing Agency:   
 Description:  This report documents the analysis and findings of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  05-13-2013 
 Agency ID:   
 ISL ID:  000000055935   Original UID: 176889 FIRST WORD: Total 
 

Title:  

Total maximum daily load, shoreline segments in Suburban Cook County, Illinois: 13 Segments from Glencoe Park Beach to Evanston South Beach

 
 Volume/Number:  2013  
 Issuing Agency:   
 Description:  This report documents the analysis and findings of the TMDL development for water segments within this watershed. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  05-13-2013 
 Agency ID:   
 ISL ID:  000000055936   Original UID: 176890 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Loads for Salt Creek, Illinois: Final Report

 
 Volume/Number:  2004 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  07 13 2004 
 Agency ID:   
 ISL ID:  000000040753   Original UID: 20924 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Loads for the East Branch of the DuPage River, Illinois

 
 Volume/Number:  2004 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  07 13 2004 
 Agency ID:   
 ISL ID:  000000040719   Original UID: 20895 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Loads for West Branch DuPage River, Illinois

 
 Volume/Number:  2004 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  12 23 2004 
 Agency ID:   
 ISL ID:  000000040722   Original UID: 20897 FIRST WORD: Total 
 

Title:  

Total Maximum Daily Loads for West Branch DuPage River, Illinois

 
 Volume/Number:  2004 October 
 Issuing Agency:   
 Description:  This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify water bodies that do not meet water quality standards and to determine the Total Maximum Daily Load for pollutants causing the impairment. 
 Date Created:  12 23 2004 
 Agency ID:   
 ISL ID:  000000040723   Original UID: 20897 FIRST WORD: Total 
 

Title:  

Triennial Capacity Development Report

 
 Volume/Number:    
 Issuing Agency:   
 Description:  The Safe Drinking Water Act Amendments of 1996 (SDWA) (PL104 -182, August 6, 1996, Title XIV, Section 1420) make provision for each primacy agent to provide for full funding of the State Revolving Loan (SRF) fund (Section 1452) allocation. This is contingent on the federal operator certification program requirements (Section 1419) being met and that a capacity development program is established and implemented. Failure to meet either the program or reporting requirements specified within these sections can result in withholding of up to 20 percent of the SRF funds available to the primacy program. Illinois has adopted legislation and rules (415 ILCS 5/15, 35 Ill. Adm. Code 651.102, 652.701-702; 77 Ill. Adm. Code 900.45(c)) for new public water supply systems, which must complete a capacity demonstration in order to obtain a construction or operating permit. The Strategy for Existing Public Water Systems was approved by U. S. EPA Region 5 September 27, 2000, and is being implemented. Revisions to the Strategy for Existing Public Water Systems have been made based upon experience learned through early implementation efforts. Those changes are noted in this report. New reporting criteria for Annual State Capacity Development Program Implementation Reports was developed by USEPA and sent to all primacy states on June 1, 2005, by certified mail (received by Illinois on August 25, 2005). This report is structured in accordance with that memorandum. 
 Date Created:   
 Agency ID:   
 ISL ID:  000000044465   Original UID: NA for serial records FIRST WORD: Triennial 
 

Title:  

Triennial Capacity Development Report, 2011

 
 Volume/Number:    
 Issuing Agency:   
 Description:  The Safe Drinking Water Act Amendments of 1996 (SDWA) (PL104 -182, August 6, 1996, Title XIV, Section 1420) make provision for each primacy agent to provide for full funding of the State Revolving Loan (SRF) fund (Section 1452) allocation. This is contingent on the federal operator certification program requirements (Section 1419) being met and that a capacity development program is established and implemented. Failure to meet either the program or reporting requirements specified within these sections can result in withholding of up to 20 percent of the SRF funds available to the primacy program. Illinois has adopted legislation and rules (415 ILCS 5/15, 35 Ill. Adm. Code 651.102, 652.701-702; 77 Ill. Adm. Code 900.45(c)) for new public water supply systems, which must complete a capacity demonstration in order to obtain a construction or operating permit. The Strategy for Existing Public Water Systems was approved by U. S. EPA Region 5 September 27, 2000, and is being implemented. Revisions to the Strategy for Existing Public Water Systems have been made based upon experience learned through early implementation efforts. Those changes are noted in this report. New reporting criteria for Annual State Capacity Development Program Implementation Reports was developed by USEPA and sent to all primacy states on June 1, 2005, by certified mail (received by Illinois on August 25, 2005). This report is structured in accordance with that memorandum. 
 Date Created:  09 27 2011 
 Agency ID:   
 ISL ID:  000000042876   Original UID: 22436 FIRST WORD: Triennial 
Page: Prev  1 2 3 4  Next